(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Please be informed that our office is closed during the upcoming Labour Day Holiday in 2024. We would also like to inform you that there may be a potential delay in response/shipment from the supplier due to the Japan Golden Week holiday which falls from 29th April to 6th May 2024. Click here for details.
  • Please Note our New Address (effective April 1, 2024): 331 North Bridge Rd, #05-01 Odeon 331, Singapore 188720.

DPI X-Axis

Days to Ship
  • All
  • 7 Day(s) or Less
  • 8 Day(s) or Less
  • 10 Day(s) or Less
  • 11 Day(s) or Less
  • 12 Day(s) or Less
  • 19 Day(s) or Less
  • 25 Day(s) or Less
  • 64 Day(s) or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Load Capacity (Range)(N)
Stroke (X Distance)(mm)
Minimum Resolution(µm)
Motor, Motor Characteristics
Travel Guide
Table Size (Length) L(mm)
Type
Table Size (Width) W(mm)
Table Material
Feeding Method
Sensor
Z-Axis Stage Surface

    Automatic X-Axis Cross Roller Type Stages; 40X40, 60X60, and 80X80

    Brand

    DPI

    Product Series

    Automatic X-Axis Cross Roller Type Stages; 40X40, 60X60, and 80X80

    CAD
    • 2D / 3D
    Days to Ship 19 Day(s)
    Load Capacity (Range)(N)30.1~50 / 100.1~
    Stroke (X Distance)(mm)±10 ~ ±15
    Minimum Resolution(µm)2
    Motor, Motor Characteristics5-Phase Stepping Motor - Standard
    Travel GuideCross Roller
    Table Size (Length) L(mm)60 ~ 80
    TypeX-Axis Stage
    Table Size (Width) W(mm)60 ~ 80
    Table MaterialAluminum
    Feeding MethodBall Screw
    SensorLimit + Home
    Z-Axis Stage SurfaceHorizontal

    Loading...

    1. 1

    Related Categories to X-Axis