(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Please be informed that our operating hours are from 9:00~15:00 during the upcoming Hari Raya Haji Holiday 2024. Click here for details.
  • Please Note our New Address (effective April 1, 2024): 331 North Bridge Rd, #05-01 Odeon 331, Singapore 188720.

Packing(Material:Chloroprene Rubber)

Packing is a part that seals the connection parts such as parts and piping to prevent water, oil, and contaminant from entering. Silicone and rubber are the most common, but special flexible PVC, which has excellent flexural fatigue strength, aging, and ozone resistance, and ethylene resin, which has excellent chemical resistance, insulation, and low friction, are also available. It features excellent durability and weather resistance, and some have excellent elasticity, heat resistance, flame retardancy, etc. Some of them have improved shielding effects because they are easy to handle and have high flexibility, and others have improved workability and processability because they can be cut with scissors. The packing can be used to protect the openings of various housings such as metal doors, window frames, switchboards, etc. as well as cushioning materials, cable protection, heat-insulating seals, etc. The shape, thickness and material of the connecting part vary depending on the place of use, so it is necessary to select a compatible one.
Days to Ship
  • All
  • 4 Day(s) or Less
  • 5 Day(s) or Less
  • 6 Day(s) or Less
  • 7 Day(s) or Less
  • 8 Day(s) or Less
  • 10 Day(s) or Less
  • 12 Day(s) or Less
  • 13 Day(s) or Less
  • 18 Day(s) or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Material
Dimension: Thickness/Depth(mm)

    Neoprene Sponge Packing

      Sponge Packing (D / SD / SS Sponge)

        Inset Packing

        Brand

        MISUMI

        SHINOHARA ELECTRIC

        SHINOHARA ELECTRIC

        Product Series

        Neoprene Sponge Packing

        Sponge Packing (D / SD / SS Sponge)【1-5 Pieces Per Package】

        Inset Packing

        CAD
        • 2D
        Days to Ship 4 Day(s) or more 4 Day(s) or more 4 Day(s) or more
        MaterialChloroprene RubberChloroprene RubberChloroprene Rubber
        Dimension: Thickness/Depth(mm)53 ~ 512.5 ~ 21

        Loading...

        1. 1

        Related Categories to Packing