(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 to 21:00 (SGT) 16/6/2024. We apologize for the inconvenience.
  • Please be informed that our operating hours are from 9:00~15:00 during the upcoming Hari Raya Haji Holiday 2024. Click here for details.
  • Please Note our New Address (effective April 1, 2024): 331 North Bridge Rd, #05-01 Odeon 331, Singapore 188720.

UNION TOOL Taper Ball End Mills (Carbide)(work material:Copper)

Days to Ship
  • All
  • 4 Day(s) or Less
  • 6 Day(s) or Less
  • 7 Day(s) or Less
  • 8 Day(s) or Less
  • 10 Day(s) or Less
  • 11 Day(s) or Less
  • 14 Day(s) or Less
  1. 1
Brand
Product Series
Days to Ship
Single corner (θ)(Degree)
Tip diameter (D)(φ)
Type
work material
Blade length (l)(mm)
R Size(mm)
Number of flutes(sheet)
Shank diameter (d)(mm)
Overall Length (L)(mm)
Coating

    DCTNB Diamond Coated 2-Flute Taper Neck Ball End Mill

      C-CTE 2000, UT Coat, 2-Flute Tapered

      Brand

      UNION TOOL

      UNION TOOL

      Product Series

      DCTNB Diamond Coated 2-Flute Taper Neck Ball End Mill

      C-CTE 2000, UT Coat, 2-Flute Tapered

      Days to Ship 10 Day(s) or more 4 Day(s) or more
      Single corner (θ)(Degree)-0.5 ~ 15
      Tip diameter (D)(φ)-0.2 ~ 2.5
      TypeTaper ballTapered square
      work materialCopper[○]Copper[○]
      Blade length (l)(mm)0.8 ~ 1.60.8 ~ 8
      R Size(mm)0.5 ~ 1-
      Number of flutes(sheet)22
      Shank diameter (d)(mm)63 ~ 8
      Overall Length (L)(mm)80 ~ 15038 ~ 50
      CoatingDia CoatTiCN

      Loading...

      1. 1

      Related Categories to Taper Ball End Mills (Carbide)