(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Please be informed that our office is closed during the upcoming Labour Day Holiday in 2024. We would also like to inform you that there may be a potential delay in response/shipment from the supplier due to the Japan Golden Week holiday which falls from 29th April to 6th May 2024. Click here for details.
  • Please Note our New Address (effective April 1, 2024): 331 North Bridge Rd, #05-01 Odeon 331, Singapore 188720.

MISUMI Strainers(Supply Side, Plumbing Thread Nominal:3/4B)

Days to Ship
  • All
  • 4 Day(s) or Less
  • 5 Day(s) or Less
  • 6 Day(s) or Less
  • 7 Day(s) or Less
  • 8 Day(s) or Less
  • 9 Day(s) or Less
  • 10 Day(s) or Less
  • 11 Day(s) or Less
  • 13 Day(s) or Less
  • 16 Day(s) or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Supply Side, Plumbing Thread Nominal
Applicable Fluid
Supply Side, Connection Type
Shape
Material
Supply Side, Tube Flange Nominal
Control Side, Connection Type
Control Side, Plumbing Thread Nominal
Control Side, Tube Flange Nominal
Max. Operating Pressure(MPa)

    Strainers

    Brand

    MISUMI

    Product Series

    Strainers

    CAD
    • 2D / 3D
    Days to Ship 4 Day(s) or more
    Supply Side, Plumbing Thread Nominal3/4B
    Applicable FluidWater / Air / Oil
    Supply Side, Connection TypeRc (R)
    ShapeY Type
    MaterialStainless Steel Cast
    Supply Side, Tube Flange Nominal-
    Control Side, Connection TypeRc (R)
    Control Side, Plumbing Thread Nominal3/4B
    Control Side, Tube Flange Nominal-
    Max. Operating Pressure(MPa)0.6

    Loading...

    1. 1

    Related Categories to Strainers