(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Please Note our New Address (effective April 1, 2024): 331 North Bridge Rd, #05-01 Odeon 331, Singapore 188720.

Screw-In Malleable Cast Iron Pipe Fitting, Reducing Tee with Collar (Small Branch Diameter)

Screw-In Malleable Cast Iron Pipe Fitting, Reducing Tee with Collar (Small Branch Diameter)

[Features]
• JFE pipe fittings are produced at cutting-edge facilities with thorough quality control.
• Moreover, ring stamp PL fittings are coat-baked with powder epoxy resin on the inner and outer surfaces, excluding screws, using a special coating method, providing enhanced adhesiveness, corrosion resistance, etc.
• Can be used with a high level of reliability.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
BRT-B-6X6X1
BRT-B-6X6X2
BRT-B-6X6X3
BRT-B-6X6X3/4
BRT-B-6X6X4
BRT-B-6X6X5
BRT-B-6X6X11/2
BRT-B-6X6X11/4
BRT-B-6X6X21/2
BRT-W-6X6X1
BRT-W-6X6X2
BRT-W-6X6X3
BRT-W-6X6X3/4
BRT-W-6X6X4
BRT-W-6X6X5
BRT-W-6X6X11/2
BRT-W-6X6X11/4
BRT-W-6X6X21/2
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Nominal of Thread M2 Surface Treatment Nominal of Thread 3(Different Diameters or Different Type Screw)

-

1 Piece(s) 89 Day(s) or more 6B(150A)6B(150A)No1B(25A)

-

1 Piece(s) 89 Day(s) or more 6B(150A)6B(150A)No2B(50A)

-

1 Piece(s) 17 Day(s) or more 6B(150A)6B(150A)No3B(80A)

-

1 Piece(s) 25 Day(s) or more 6B(150A)6B(150A)No3/4B(20A)

-

1 Piece(s) 17 Day(s) or more 6B(150A)6B(150A)No4B(100A)

-

1 Piece(s) 17 Day(s) or more 6B(150A)6B(150A)No5B(125A)

-

1 Piece(s) 89 Day(s) or more 6B(150A)6B(150A)No1 1/2B(40A)

-

1 Piece(s) 89 Day(s) or more 6B(150A)6B(150A)No1 1/4B(32A)

-

1 Piece(s) 17 Day(s) or more 6B(150A)6B(150A)No2 1/2B(65A)

-

1 Piece(s) 89 Day(s) or more 6B(150A)6B(150A)Zinc Plating1B(25A)

-

1 Piece(s) 89 Day(s) or more 6B(150A)6B(150A)Zinc Plating2B(50A)

-

1 Piece(s) 17 Day(s) or more 6B(150A)6B(150A)Zinc Plating3B(80A)

-

1 Piece(s) 25 Day(s) or more 6B(150A)6B(150A)Zinc Plating3/4B(20A)

-

1 Piece(s) 17 Day(s) or more 6B(150A)6B(150A)Zinc Plating4B(100A)

-

1 Piece(s) 17 Day(s) or more 6B(150A)6B(150A)Zinc Plating5B(125A)

-

1 Piece(s) 89 Day(s) or more 6B(150A)6B(150A)Zinc Plating1 1/2B(40A)

-

1 Piece(s) 89 Day(s) or more 6B(150A)6B(150A)Zinc Plating1 1/4B(32A)

-

1 Piece(s) 17 Day(s) or more 6B(150A)6B(150A)Zinc Plating2 1/2B(65A)

Loading...

  1. 1

Basic Information

Connecting Shape Tee Connection Type Screw⇔Screw Different Diameter Material Cast Iron
Connection Thread Type M1 Rc Connection Thread Type M2 Rc Applicable Fluid Water / Air / Steam / Gas / Oil
Type Fitting Max. Operating Pressure(MPa) 1 Types of Screw 3 (When Different Dia. or Different Type Screw) Rc
Divisions of Max. Operating Pressure 1.0Mpa or Less Interior Resin Lining No Details of Max. Operating Pressure (Vapor/Air/Gas/Oil which is 300℃ or Less)(MPa) 1.0
Details of Max. Operating Pressure (Steady Flow which is 120℃ or Less)(MPa) 2.5

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)