(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Please be informed that our operating hours are from 9:00~15:00 during the upcoming Vesak Day Holiday 2024. Click here for details.
  • Please Note our New Address (effective April 1, 2024): 331 North Bridge Rd, #05-01 Odeon 331, Singapore 188720.

Steel Pipe Fitting, Screw-in Pipe Fitting, Tee (BT-21/2B-B)

Steel Pipe Fitting, Screw-in Pipe Fitting, Tee BT-21/2B-B

Maximum operating pressure: 2.5 MPa (steady flow of water at no more than 120°C or below), 1.0 MPa (steam, air, gas, and oil at no more than 300°C).

PDF

Japanese Only

Part Number

Configured Part Number is shown.

BT-21/2B-B

Part Number
BT-21/2B-B
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Applicable Fluid Surface Treatment Band

SGD 29.34

1 Piece(s) 10 Day(s) or more 2 1/2B(65A)Water / Air / Steam / OilNoPresence

Loading...

  1. 1

Basic Information

Connecting Shape Tee Connection Type Screw⇔Screw Same Diameter・Different Type Material STPG370(SCH40)
Connection Thread Type M1 Rc Type Fitting Max. Operating Pressure(MPa) 2.5
Divisions of Max. Operating Pressure than 2.0Mpa Interior Resin Lining No

Please check the type/dimensions/specifications of the part BT-21/2B-B in the Steel Pipe Fitting, Screw-in Pipe Fitting, Tee series.

Similar Part Numbers

Part Number
BT-11/2B-W
BT-11/4B-W
BT-1B-W
BT-21/2B-C
BT-21/2B-W
BT-2B-W
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Applicable Fluid Surface Treatment Band

SGD 7.42

1 Piece(s) 6 Day(s) or more 1 1/2B(40A)Oil / Air / Water / Gas[Zinc Plating] Hot zinc platingPresence

SGD 5.99

1 Piece(s) 6 Day(s) or more 1 1/4B(32A)Oil / Air / Water / Gas[Zinc Plating] Hot zinc platingPresence

SGD 3.83

1 Piece(s) 6 Day(s) or more 1B(25A)Oil / Air / Water / Gas[Zinc Plating] Hot zinc platingPresence

SGD 51.52

1 Piece(s) 10 Day(s) or more 2 1/2B(65A)Water[Resin Coating] Epoxy Resin CoatingPresence

SGD 35.00

1 Piece(s) 10 Day(s) or more 2 1/2B(65A)Oil / Air / Water / Gas[Zinc Plating] Hot zinc platingPresence

SGD 11.60

1 Piece(s) 6 Day(s) or more 2B(50A)Oil / Air / Water / Gas[Zinc Plating] Hot zinc platingPresence

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)