(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 30/6/2024 to 6:00 (SGT) 1/7/2024. We apologize for the inconvenience.
  • Please Note our New Address (effective April 1, 2024): 331 North Bridge Rd, #05-01 Odeon 331, Singapore 188720.

Steel Pipe Fitting, Screw-in Pipe Fitting, Tee

Steel Pipe Fitting, Screw-in Pipe Fitting, Tee

Maximum operating pressure: 2.5 MPa (steady flow of water at no more than 120°C or below), 1.0 MPa (steam, air, gas, and oil at no more than 300°C).

PDF

Japanese Only

Part Number

Configured Part Number is shown.

Part Number
BT-1/2B-W
BT-1B-W
BT-2B-W
BT-3/4B-W
BT-3B-W
BT-4B-W
BT-5B-W
BT-6B-W
BT-11/2B-W
BT-11/4B-W
BT-21/2B-W
T-1/2B-W
T-1/4B-W
T-1/8B-W
T-1B-W
T-2B-W
T-3/4B-W
T-3/8B-W
T-11/2B-W
T-11/4B-W
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Applicable Fluid Surface Treatment Band

SGD 2.23

1 Piece(s) 6 Day(s) or more 1/2B(15A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 3.83

1 Piece(s) 6 Day(s) or more 1B(25A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 11.60

1 Piece(s) 6 Day(s) or more 2B(50A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 2.73

1 Piece(s) 4 Day(s) or more 3/4B(20A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 49.64

1 Piece(s) 10 Day(s) or more 3B(80A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 83.32

1 Piece(s) 10 Day(s) or more 4B(100A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 157.82

1 Piece(s) 10 Day(s) or more 5B(125A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 239.35

1 Piece(s) 10 Day(s) or more 6B(150A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 7.42

1 Piece(s) 6 Day(s) or more 1 1/2B(40A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 5.99

1 Piece(s) 6 Day(s) or more 1 1/4B(32A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 35.00

1 Piece(s) 10 Day(s) or more 2 1/2B(65A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 2.46

1 Piece(s) 5 Day(s) or more 1/2B(15A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

SGD 3.75

1 Piece(s) 5 Day(s) or more 1/4B(8A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

SGD 3.75

1 Piece(s) 10 Day(s) or more 1/8B(6A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

SGD 4.80

1 Piece(s) 5 Day(s) or more 1B(25A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

SGD 15.92

1 Piece(s) 5 Day(s) or more 2B(50A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

SGD 2.54

1 Piece(s) 6 Day(s) or more 3/4B(20A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

SGD 3.13

1 Piece(s) 4 Day(s) or more 3/8B(10A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

SGD 9.93

1 Piece(s) 5 Day(s) or more 1 1/2B(40A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

SGD 7.99

1 Piece(s) 6 Day(s) or more 1 1/4B(32A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

Loading...

  1. 1

Basic Information

Connecting Shape Tee Connection Type Screw⇔Screw Same Diameter・Different Type Material STPG370(SCH40)
Connection Thread Type M1 Rc Type Fitting Max. Operating Pressure(MPa) 2.5
Divisions of Max. Operating Pressure than 2.0Mpa Interior Resin Lining No

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)