(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Please be informed that our operating hours are from 9:00~15:00 during the upcoming Hari Raya Haji Holiday 2024. Click here for details.
  • Please Note our New Address (effective April 1, 2024): 331 North Bridge Rd, #05-01 Odeon 331, Singapore 188720.

U-Shaped Bracket NC-U Bolt (SG / CU / SU)

U-Shaped Bracket NC-U Bolt (SG / CU / SU)

[Features]
▪ U-bolt for SGP tubes, copper tubes, stainless steel thin-walled tubes (SU Molar pipe), and electrical insulation.
▪ Nylon powder coating type.
▪ Nylon powder coating type with excellent electrical insulation and shock resistance properties.
▪ Heat resistance room temperature 100°C. (No abnormalities in data for test conducted under 150°C for 24 hours)
· U-bolt is zinc finished.
▪ Plate is made of Polypropylene.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
A12114-0019
A12114-0023
A12114-0038
A12114-0042
A12114-0057
A12114-0061
A12114-0076
A12114-0095
A12114-0108
A12114-0112
A12114-0127
A12114-0131
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Applicable Pipe Type Size Compatible Pipe Outer Diameter
(mm)
Color

SGD 6.78

1 Piece(s) 7 Day(s) or more 20~Less than 30[Steel Pipe / Coated Steel Pipe] SGP PipeSG-1521.7Ivory

SGD 11.21

1 Piece(s) 7 Day(s) or more 20~Less than 30[Steel Pipe / Coated Steel Pipe] SGP PipeSG-2027.2Ivory

SGD 12.03

1 Piece(s) 7 Day(s) or more 30~Less than 40[Steel Pipe / Coated Steel Pipe] SGP PipeSG-2534Ivory

SGD 13.35

1 Piece(s) 7 Day(s) or more 40~Less than 50[Steel Pipe / Coated Steel Pipe] SGP PipeSG-3242.7Ivory

SGD 8.69

1 Piece(s) 7 Day(s) or more 40~Less than 50[Steel Pipe / Coated Steel Pipe] SGP PipeSG-4048.6Ivory

SGD 9.36

1 Piece(s) 7 Day(s) or more 60~Less than 70[Steel Pipe / Coated Steel Pipe] SGP PipeSG-5060.5Ivory

SGD 15.77

1 Piece(s) 7 Day(s) or more 70~Less than 80[Steel Pipe / Coated Steel Pipe] SGP PipeSG-6576.3Ivory

SGD 10.49

1 Piece(s) 7 Day(s) or more 80~Less than 90[Steel Pipe / Coated Steel Pipe] SGP PipeSG-8089.1Ivory

SGD 17.49

1 Piece(s) 7 Day(s) or more 100~Less than 200[Steel Pipe / Coated Steel Pipe] SGP PipeSG-100114.3Ivory

SGD 31.36

1 Piece(s) 7 Day(s) or more 100~Less than 200[Steel Pipe / Coated Steel Pipe] SGP PipeSG-125139.8Ivory

SGD 41.99

1 Piece(s) 7 Day(s) or more 100~Less than 200[Steel Pipe / Coated Steel Pipe] SGP PipeSG-150165.2Ivory

SGD 67.99

1 Piece(s) 7 Day(s) or more 200~Less than 300[Steel Pipe / Coated Steel Pipe] SGP PipeSG-200216.3Ivory

Loading...

  1. 1

Basic Information

Type U-Bolt Material Steel Surface Treatment Electrolytic Zinc Plating
Qty.(piece) 1

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)