(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Please be informed that our operating hours are from 9:00~15:00 during the upcoming Hari Raya Haji Holiday 2024. Click here for details.
  • Please Note our New Address (effective April 1, 2024): 331 North Bridge Rd, #05-01 Odeon 331, Singapore 188720.

Vacuum Tweezers, Manual Wands(Part Structure:Adsorption Part)

Days to Ship
  • All
  • 4 Day(s) or Less
  • 6 Day(s) or Less
  • 7 Day(s) or Less
  • 8 Day(s) or Less
  • 9 Day(s) or Less
  • 16 Day(s) or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Type
Application
Part Structure
Features
Adsorption Part Material
Arrival Suction Pressure (Gauge Pressure)(kPa)

    Vacuum Tweezers, Conductive, C Series, Adhesion Chip for Wafers

      Vacuum Release Tweezers, Application Nozzle

        Standard Tip Attachment (Metal)

          Vacuum Release Tweezers, Application Cap (Pad)

            Standard Tip Attachment (fluoropolymer)

              Standard Tip Attachment (Conductive PEEK)

                SUS Injection Attachment

                Brand

                FURORO

                FURORO

                MIRUC OPTICAL

                FURORO

                MIRUC OPTICAL

                MIRUC OPTICAL

                MIRUC OPTICAL

                Product Series

                Vacuum Tweezers, Conductive, C Series, Adhesion Chip for Wafers

                Vacuum Release Tweezers, Application Nozzle

                Standard Tip Attachment (Metal)

                Vacuum Release Tweezers, Application Cap (Pad)

                Standard Tip Attachment (fluoropolymer)

                Standard Tip Attachment (Conductive PEEK)

                SUS Injection Attachment

                CAD
                • 2D
                • 2D
                • 2D
                • 2D
                • 2D
                • 2D
                • 2D
                Days to Ship 4 Day(s) or more 4 Day(s) or more 6 Day(s) or more 4 Day(s) or more 6 Day(s) or more 6 Day(s) or more 6 Day(s) or more
                TypeVacuum TweezersVacuum TweezersVacuum TweezersVacuum TweezersVacuum TweezersVacuum TweezersVacuum Tweezers
                ApplicationFor Transporting WafersFor Transporting Small ObjectsRelated Equipment / PartsFor Transporting Small ObjectsRelated Equipment / PartsRelated Equipment / PartsRelated Equipment / Parts
                Part StructureAdsorption PartAdsorption PartAdsorption PartAdsorption PartAdsorption PartAdsorption PartAdsorption Part
                FeaturesElectrical Conductivity / Chemical Resistance / Heat ResistanceElectrical Conductivity / Chemical Resistance / Heat Resistance / Other PropertiesHeat ResistanceElectrical Conductivity / Chemical Resistance / Heat ResistanceChemical ResistanceElectrical ConductivityStandard
                Adsorption Part MaterialPEEKPCTFE / PEEK / Silicon Rubber / Fluororubber / Polyimide CompositeCopperPCTFE / PEEK / Silicon Rubber / FluororubberPCTFEPEEKSUS
                Arrival Suction Pressure (Gauge Pressure)(kPa)-------

                Loading...

                1. 1

                Related Categories to Vacuum Tweezers, Manual Wands