(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Please be informed that our office is closed during the upcoming Labour Day Holiday in 2024. We would also like to inform you that there may be a potential delay in response/shipment from the supplier due to the Japan Golden Week holiday which falls from 29th April to 6th May 2024. Click here for details.
  • Please Note our New Address (effective April 1, 2024): 331 North Bridge Rd, #05-01 Odeon 331, Singapore 188720.

Stepper Motor, PK Series

Stepper Motor, PK Series

Oriental Motor, stepper motor PK Series.

(i)Caution

  • The product image is a representative image.
  • Some products are scheduled to be discontinued from March 2024. Recommended alternative PKP series

PDF

Part Number

Configured Part Number is shown.

 
Part Number
PK243-01A
PK243-01B
PK243-02A
PK243-02B
PK243-03A
PK243-03B
PK243A1-SG3.6
PK243A1-SG7.2
PK243A1-SG9
PK243A1-SG10
PK243A1-SG18
PK243A1-SG36
PK243A1-SG50
PK243A1-SG100
PK243A2-SG3.6
PK243A2-SG7.2
PK243A2-SG9
PK243A2-SG10
PK243A2-SG18
PK243A2-SG36
PK243B1-SG3.6
PK243B1-SG7.2
PK243B1-SG9
PK243B1-SG10
PK243B1-SG18
PK243B1-SG36
PK243B1-SG50
PK243B1-SG100
PK243B2-SG3.6
PK243B2-SG7.2
PK243B2-SG9
PK243B2-SG10
PK243B2-SG18
PK243B2-SG36
PK243DA
PK243DB
PK243M-01A
PK243M-01B
PK243M-02A
PK243M-02B
PK243M-03A
PK243M-03B
PK243MD15A
PK243MD15AA
PK243MD15B
PK243MD15BA
PK244-01A
PK244-01B
PK244-02A
PK244-02B
PK244-03A
PK244-03B
PK244-04A
PK244-04B
PK244DA
PK244DB
PK244M-01A
PK244M-01B
PK244M-02A
PK244M-02B
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipSquare Flange Size A
(mm)
Power Supply Voltage Specifications Control Method Step Angle
(°)
Excitation maximum static torque (details)
(N·m)
Reducer Drive Method Backlash
(°)
Excitation maximum static torque (classification)
(N·m)
Electromagnetic Brake Main Body Length L / L1
(mm)
Reduction Ratio Shaft Shape Encoder Gearhead type Accessory Specifications Connection Rated Current Connection Cable Type

SGD 98.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop1.80.16NoUnipolar-~0.2---Single shaftN/AStandard-StandardUnipolar 6 lead wire0.95 A/phaseLead method

SGD 112.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop1.80.16NoUnipolar-~0.2---Double shaftN/AStandard-StandardUnipolar 6 lead wire0.95 A/phaseLead method

SGD 105.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop1.80.16NoUnipolar-~0.2---Single shaftN/AStandard-StandardUnipolar 6 lead wire0.4 A/phaseLead method

SGD 112.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop1.80.16NoUnipolar-~0.2---Double shaftN/AStandard-StandardUnipolar 6 lead wire0.4 A/phaseLead method

SGD 105.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop1.80.16NoUnipolar-~0.2---Single shaftN/AStandard-StandardUnipolar 6 lead wire0.31 A/phaseLead method

SGD 112.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop1.80.16NoUnipolar-~0.2---Double shaftN/AStandard-StandardUnipolar 6 lead wire0.31 A/phaseLead method

SGD 292.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.50.2PresenceUnipolar-~0.2--3.6Single shaftN/ASH--Unipolar 6 lead wire0.95 A/phaseLead method

SGD 292.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.250.4PresenceUnipolar-~0.4--7.2Single shaftN/ASH--Unipolar 6 lead wire0.95 A/phaseLead method

SGD 292.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.20.5PresenceUnipolar-~0.5--9Single shaftN/ASH--Unipolar 6 lead wire0.95 A/phaseLead method

SGD 292.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.180.56PresenceUnipolar-~0.6--10Single shaftN/ASH--Unipolar 6 lead wire0.95 A/phaseLead method

SGD 328.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.10.8PresenceUnipolar-~0.8--18Single shaftN/ASH--Unipolar 6 lead wire0.95 A/phaseLead method

SGD 328.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.050.8PresenceUnipolar-~0.8--36Single shaftN/ASH--Unipolar 6 lead wire0.95 A/phaseLead method

SGD 345.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.0360.8PresenceUnipolar-~0.8--50Single shaftN/ASH--Unipolar 6 lead wire0.95 A/phaseLead method

SGD 345.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.0180.8PresenceUnipolar-~0.8--100Single shaftN/ASH--Unipolar 6 lead wire0.95 A/phaseLead method

SGD 292.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.50.2PresenceUnipolar-~0.2--3.6Single shaftN/ASH--Unipolar 6 lead wire0.4 A/phaseLead method

SGD 292.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.250.4PresenceUnipolar-~0.4--7.2Single shaftN/ASH--Unipolar 6 lead wire0.4 A/phaseLead method

SGD 292.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.20.5PresenceUnipolar-~0.5--9Single shaftN/ASH--Unipolar 6 lead wire0.4 A/phaseLead method

SGD 292.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.180.56PresenceUnipolar-~0.6--10Single shaftN/ASH--Unipolar 6 lead wire0.4 A/phaseLead method

SGD 328.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.10.8PresenceUnipolar-~0.8--18Single shaftN/ASH--Unipolar 6 lead wire0.4 A/phaseLead method

SGD 328.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.050.8PresenceUnipolar-~0.8--36Single shaftN/ASH--Unipolar 6 lead wire0.4 A/phaseLead method

SGD 295.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.50.2PresenceUnipolar-~0.2--3.6Double shaftN/ASH--Unipolar 6 lead wire0.95 A/phaseLead method

SGD 295.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.250.4PresenceUnipolar-~0.4--7.2Double shaftN/ASH--Unipolar 6 lead wire0.95 A/phaseLead method

SGD 295.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.20.5PresenceUnipolar-~0.5--9Double shaftN/ASH--Unipolar 6 lead wire0.95 A/phaseLead method

SGD 295.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.180.56PresenceUnipolar-~0.6--10Double shaftN/ASH--Unipolar 6 lead wire0.95 A/phaseLead method

SGD 334.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.10.8PresenceUnipolar-~0.8--18Double shaftN/ASH--Unipolar 6 lead wire0.95 A/phaseLead method

SGD 334.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.050.8PresenceUnipolar-~0.8--36Double shaftN/ASH--Unipolar 6 lead wire0.95 A/phaseLead method

SGD 349.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.0360.8PresenceUnipolar-~0.8--50Double shaftN/ASH--Unipolar 6 lead wire0.95 A/phaseLead method

SGD 349.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.0180.8PresenceUnipolar-~0.8--100Double shaftN/ASH--Unipolar 6 lead wire0.95 A/phaseLead method

SGD 295.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.50.2PresenceUnipolar-~0.2--3.6Double shaftN/ASH--Unipolar 6 lead wire0.4 A/phaseLead method

SGD 295.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.250.4PresenceUnipolar-~0.4--7.2Double shaftN/ASH--Unipolar 6 lead wire0.4 A/phaseLead method

SGD 295.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.20.5PresenceUnipolar-~0.5--9Double shaftN/ASH--Unipolar 6 lead wire0.4 A/phaseLead method

SGD 295.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.180.56PresenceUnipolar-~0.6--10Double shaftN/ASH--Unipolar 6 lead wire0.4 A/phaseLead method

SGD 334.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.10.8PresenceUnipolar-~0.8--18Double shaftN/ASH--Unipolar 6 lead wire0.4 A/phaseLead method

SGD 334.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.050.8PresenceUnipolar-~0.8--36Double shaftN/ASH--Unipolar 6 lead wire0.4 A/phaseLead method

SGD 105.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop1.80.2NoBipolar-~0.2---Single shaftN/AStandard-StandardBipolar 4-lead wire1.5 A/phaseLead method

SGD 112.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop1.80.2NoBipolar-~0.2---Double shaftN/AStandard-StandardBipolar 4-lead wire1.5 A/phaseLead method

SGD 105.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.90.16NoUnipolar-~0.2---Single shaftN/AStandard-High resolutionUnipolar 6 lead wire0.95 A/phaseLead method

SGD 112.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.90.16NoUnipolar-~0.2---Double shaftN/AStandard-High resolutionUnipolar 6 lead wire0.95 A/phaseLead method

SGD 105.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.90.16NoUnipolar-~0.2---Single shaftN/AStandard-High resolutionUnipolar 6 lead wire0.6 A/phaseLead method

SGD 112.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.90.16NoUnipolar-~0.2---Double shaftN/AStandard-High resolutionUnipolar 6 lead wire0.6 A/phaseLead method

SGD 105.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.90.16NoUnipolar-~0.2---Single shaftN/AStandard-High resolutionUnipolar 6 lead wire0.31 A/phaseLead method

SGD 112.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.90.16NoUnipolar-~0.2---Double shaftN/AStandard-High resolutionUnipolar 6 lead wire0.31 A/phaseLead method

SGD 90.00

1 Piece(s) 20 Day(s) or more 42Two-phaseDC SpecificationsOpen loop0.90.2NoBipolar-~0.2---Single shaftN/AStandard-High resolutionBipolar 4-lead wire1.5 A/phaseLead method

SGD 90.00

1 Piece(s) 20 Day(s) or more ---------------------

SGD 95.00

1 Piece(s) 20 Day(s) or more 42Two-phaseDC SpecificationsOpen loop0.90.2NoBipolar-~0.2---Double shaftN/AStandard-High resolutionBipolar 4-lead wire1.5 A/phaseLead method

SGD 95.00

1 Piece(s) 20 Day(s) or more ---------------------

SGD 108.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop1.80.26NoUnipolar-~0.3---Single shaftN/AStandard-StandardUnipolar 6 lead wire1.2 A/phaseLead method

SGD 113.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop1.80.26NoUnipolar-~0.3---Double shaftN/AStandard-StandardUnipolar 6 lead wire1.2 A/phaseLead method

SGD 108.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop1.80.26NoUnipolar-~0.3---Single shaftN/AStandard-StandardUnipolar 6 lead wire0.8 A/phaseLead method

SGD 113.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop1.80.26NoUnipolar-~0.3---Double shaftN/AStandard-StandardUnipolar 6 lead wire0.8 A/phaseLead method

SGD 108.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop1.80.26NoUnipolar-~0.3---Single shaftN/AStandard-StandardUnipolar 6 lead wire0.4 A/phaseLead method

SGD 113.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop1.80.26NoUnipolar-~0.3---Double shaftN/AStandard-StandardUnipolar 6 lead wire0.4 A/phaseLead method

SGD 108.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop1.80.26NoUnipolar-~0.3---Single shaftN/AStandard-StandardUnipolar 6 lead wire0.2 A/phaseLead method

SGD 113.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop1.80.26NoUnipolar-~0.3---Double shaftN/AStandard-StandardUnipolar 6 lead wire0.2 A/phaseLead method

SGD 108.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop1.80.33NoBipolar-~0.4---Single shaftN/AStandard-StandardBipolar 4-lead wire1.5 A/phaseLead method

SGD 113.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop1.80.33NoBipolar-~0.4---Double shaftN/AStandard-StandardBipolar 4-lead wire1.5 A/phaseLead method

SGD 108.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.90.26NoUnipolar-~0.3---Single shaftN/AStandard-High resolutionUnipolar 6 lead wire1.2 A/phaseLead method

SGD 113.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.90.26NoUnipolar-~0.3---Double shaftN/AStandard-High resolutionUnipolar 6 lead wire1.2 A/phaseLead method

SGD 108.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.90.26NoUnipolar-~0.3---Single shaftN/AStandard-High resolutionUnipolar 6 lead wire0.8 A/phaseLead method

SGD 113.00

1 Piece(s) 17 Day(s) 42Two-phaseDC SpecificationsOpen loop0.90.26NoUnipolar-~0.3---Double shaftN/AStandard-High resolutionUnipolar 6 lead wire0.8 A/phaseLead method

Loading...

Basic Information

Type Details Motor Unit

Tech Support