(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Please be informed that our operating hours are from 9:00~15:00 during the upcoming Vesak Day Holiday 2024. Click here for details.
  • Please Note our New Address (effective April 1, 2024): 331 North Bridge Rd, #05-01 Odeon 331, Singapore 188720.

Steel Pipe Fitting, Screw-In Pipe Fitting, Union Standard

Steel Pipe Fitting, Screw-In Pipe Fitting, Union Standard

Maximum operating pressure: 2.5 MPa (steady flow of water at no more than 120°C or below), 1.0 MPa (steam, air, gas, and oil at no more than 300°C).

PDF

Japanese Only

Part Number

Configured Part Number is shown.

Part Number
FU-1/2B-B
FU-1/2B-W
FU-1/4B-B
FU-1/4B-W
FU-1/8B-B
FU-1/8B-W
FU-1B-B
FU-1B-W
FU-2B-B
FU-2B-W
FU-3/4B-B
FU-3/4B-W
FU-3/8B-B
FU-3/8B-W
FU-3B-B
FU-3B-W
FU-4B-B
FU-4B-W
FU-11/2B-B
FU-11/2B-W
FU-11/4B-B
FU-11/4B-W
FU-21/2B-B
FU-21/2B-W
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Applicable Fluid Surface Treatment

SGD 6.35

1 Piece(s) 5 Day(s) or more 1/2B(15A)Water / Air / Steam / OilNo

SGD 6.71

1 Piece(s) 6 Day(s) or more 1/2B(15A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

SGD 7.42

1 Piece(s) 6 Day(s) or more 1/4B(8A)Water / Air / Steam / OilNo

SGD 7.70

1 Piece(s) 6 Day(s) or more 1/4B(8A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

SGD 7.42

1 Piece(s) 10 Day(s) or more 1/8B(6A)Water / Air / Steam / OilNo

SGD 7.70

1 Piece(s) 10 Day(s) or more 1/8B(6A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

SGD 10.40

1 Piece(s) 5 Day(s) or more 1B(25A)Water / Air / Steam / OilNo

SGD 10.79

1 Piece(s) 5 Day(s) or more 1B(25A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

SGD 29.52

1 Piece(s) 5 Day(s) or more 2B(50A)Water / Air / Steam / OilNo

SGD 26.59

1 Piece(s) 5 Day(s) or more 2B(50A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

SGD 7.68

1 Piece(s) 5 Day(s) or more 3/4B(20A)Water / Air / Steam / OilNo

SGD 8.02

1 Piece(s) 4 Day(s) or more 3/4B(20A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

SGD 7.42

1 Piece(s) 5 Day(s) or more 3/8B(10A)Water / Air / Steam / OilNo

SGD 7.70

1 Piece(s) 6 Day(s) or more 3/8B(10A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

SGD 82.22

1 Piece(s) 6 Day(s) or more 3B(80A)Water / Air / Steam / OilNo

SGD 86.25

1 Piece(s) 6 Day(s) or more 3B(80A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

SGD 161.74

1 Piece(s) 10 Day(s) or more 4B(100A)Water / Air / Steam / OilNo

SGD 140.68

1 Piece(s) 6 Day(s) or more 4B(100A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

SGD 19.85

1 Piece(s) 6 Day(s) or more 1 1/2B(40A)Water / Air / Steam / OilNo

SGD 18.98

1 Piece(s) 4 Day(s) or more 1 1/2B(40A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

SGD 14.91

1 Piece(s) 6 Day(s) or more 1 1/4B(32A)Water / Air / Steam / OilNo

SGD 13.84

1 Piece(s) 6 Day(s) or more 1 1/4B(32A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

SGD 64.45

1 Piece(s) 6 Day(s) or more 2 1/2B(65A)Water / Air / Steam / OilNo

SGD 67.21

1 Piece(s) 6 Day(s) or more 2 1/2B(65A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

Loading...

  1. 1

Basic Information

Connecting Shape Union Connection Type Screw⇔Screw Same Diameter・Different Type Material STPG370(SCH40)
Connection Thread Type M1 Rc Type Fitting Max. Operating Pressure(MPa) 2.5
Divisions of Max. Operating Pressure than 2.0Mpa Interior Resin Lining No

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)