(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Please be informed that our office is closed during the upcoming Labour Day Holiday in 2024. We would also like to inform you that there may be a potential delay in response/shipment from the supplier due to the Japan Golden Week holiday which falls from 29th April to 6th May 2024. Click here for details.
  • Please Note our New Address (effective April 1, 2024): 331 North Bridge Rd, #05-01 Odeon 331, Singapore 188720.

Butt Weld Pipe Fitting, Steel Pipe, 45° Elbow, Black Tube (JIS-45E(L)-FSGP-4B)

Butt Weld Pipe Fitting, Steel Pipe, 45° Elbow, Black Tube JIS-45E(L)-FSGP-4B

Material: Steel, nominal diameters: 1/2B(15A), 3/4B(20A), 1B(25A), 1 1/4B(32A), 1 1/2B(40A), 2B(50A), 2 1/2B(65A), 3 1/2B(90A), 3B(80A), 4B(100A), 5B(125A), 6B(150A), 8B(200A)
• Applicable fluids: water, air, steam, gas, oil.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

JIS-45E(L)-FSGP-4B

 
Part Number
JIS-45E(L)-FSGP-4B
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMaterial Nominal Thickness Nominal Dia.

SGD 27.68

1 Piece(s) 4 Day(s) [Steel] 00003-4B(100A)

Loading...

  1. 1

Basic Information

Type Butt Welding Type Fitting Shape Elbows Surface Treatment Not Provided
Applicable Fluid Water / Air / vapor / Gas / Oil

Please check the type/dimensions/specifications of the part JIS-45E(L)-FSGP-4B in the Butt Weld Pipe Fitting, Steel Pipe, 45° Elbow, Black Tube series.

Similar Part Numbers

Part Number
JIS-45E(L)-FSGP-11/4B
JIS-45E(L)-FSGP-12B
JIS-45E(L)-FSGP-14B
JIS-45E(L)-FSGP-5B
JIS-45E(L)-FSGP-6B
JIS-45E(L)-FSGP-8B
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMaterial Nominal Thickness Nominal Dia.

SGD 5.39

1 Piece(s) 4 Day(s) Steel-1 1/4B(32A)

SGD 254.15

1 Piece(s) 11 Day(s) Steel-12B(300A)

SGD 452.04

1 Piece(s) 11 Day(s) Steel-14B(350A)

SGD 29.20

1 Piece(s) 11 Day(s) Steel-5B(125A)

SGD 47.28

1 Piece(s) 11 Day(s) Steel-6B(150A)

SGD 96.51

1 Piece(s) 11 Day(s) Steel-8B(200A)

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)