(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 21/4/2024 to 6:00 (SGT) 22/4/2024. We apologize for the inconvenience.
  • Please Note our New Address (effective April 1, 2024): 331 North Bridge Rd, #05-01 Odeon 331, Singapore 188720.

Suspension Pipe Bracket Piping with CL Tongue (Electrogalvanized/Stainless Steel)

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
A10156-0010
A10156-0024
A10156-0039
A10156-0043
A10156-0058
A10156-0062
A10156-0077
A10156-0081
A10156-0096
A10156-0109
A10156-0113
A10203-0011
A10203-0026
A10203-0045
A10203-0050
A10203-0064
A10203-0079
A10203-0083
A10203-0098
A10203-0115
A10203-0120
A10203-0134
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Material Surface Treatment Nominal Diameter (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)

SGD 2.01

1 Piece(s) 4 Day(s) or more 20~Less than 30Steel[Zinc Plating] Electrolytic Zinc Plating15A1/225.7

SGD 1.47

1 Piece(s) 7 Day(s) or more 30~Less than 40Steel[Zinc Plating] Electrolytic Zinc Plating20A3/431.2

SGD 1.49

1 Piece(s) 5 Day(s) or more 30~Less than 40Steel[Zinc Plating] Electrolytic Zinc Plating25A137.6

SGD 1.71

1 Piece(s) 5 Day(s) or more 40~Less than 50Steel[Zinc Plating] Electrolytic Zinc Plating32A1 1/446.3

SGD 2.66

1 Piece(s) 5 Day(s) or more 50~Less than 60Steel[Zinc Plating] Electrolytic Zinc Plating40A1 1/252.2

SGD 1.95

1 Piece(s) 5 Day(s) or more 60~Less than 70Steel[Zinc Plating] Electrolytic Zinc Plating50A264.1

SGD 2.43

1 Piece(s) 5 Day(s) or more 70~Less than 80Steel[Zinc Plating] Electrolytic Zinc Plating65A2 1/279.9

SGD 2.68

1 Piece(s) 5 Day(s) or more 90~Less than 100Steel[Zinc Plating] Electrolytic Zinc Plating80A392.7

SGD 2.86

1 Piece(s) 5 Day(s) or more 100~Less than 200Steel[Zinc Plating] Electrolytic Zinc Plating100A4118.3

SGD 15.10

1 Piece(s) 9 Day(s) or more 100~Less than 200Steel[Zinc Plating] Electrolytic Zinc Plating125A5143.8

SGD 21.80

1 Piece(s) 10 Day(s) 100~Less than 200Steel[Zinc Plating] Electrolytic Zinc Plating150A6170.2

SGD 12.72

1 Piece(s) 4 Day(s) or more 20~Less than 30[Stainless] Stainless SteelNo15A1/225.7

SGD 8.06

1 Piece(s) 6 Day(s) or more 30~Less than 40[Stainless] Stainless SteelNo20A3/431.2

SGD 8.36

1 Piece(s) 6 Day(s) or more 30~Less than 40[Stainless] Stainless SteelNo25A137.6

SGD 8.60

1 Piece(s) 6 Day(s) or more 40~Less than 50[Stainless] Stainless SteelNo32A1 1/446.3

SGD 9.31

1 Piece(s) 6 Day(s) or more 50~Less than 60[Stainless] Stainless SteelNo40A1 1/252.2

SGD 9.75

1 Piece(s) 6 Day(s) or more 60~Less than 70[Stainless] Stainless SteelNo50A264.1

SGD 10.42

1 Piece(s) 6 Day(s) or more 70~Less than 80[Stainless] Stainless SteelNo65A2 1/279.9

SGD 10.79

1 Piece(s) 6 Day(s) or more 90~Less than 100[Stainless] Stainless SteelNo80A392.7

SGD 11.51

1 Piece(s) 6 Day(s) or more 100~Less than 200[Stainless] Stainless SteelNo100A4118.3

SGD 37.89

1 Piece(s) 9 Day(s) or more 100~Less than 200[Stainless] Stainless SteelNo125A5143.8

SGD 43.11

1 Piece(s) 9 Day(s) or more 100~Less than 200[Stainless] Stainless SteelNo150A6170.2

Loading...

  1. 1

Basic Information

Type Hanging Band Applicable Tube Type Coating Steel Pipe Qty.(piece) 1

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)