(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Please Note our New Address (effective April 1, 2024): 331 North Bridge Rd, #05-01 Odeon 331, Singapore 188720.

Current Feedthrough, Lead-in Terminals(Type of Related Component:Insulating Fittings)

Days to Ship
  • All
  • 4 Day(s) or Less
  • 9 Day(s) or Less
  • 10 Day(s) or Less
  • 13 Day(s) or Less
  • 17 Day(s) or Less
  • 18 Day(s) or Less
  • 20 Day(s) or Less
  • 21 Day(s) or Less
  • 22 Day(s) or Less
  • 25 Day(s) or Less
  1. 1
Brand
Product Series
Days to Ship
Type
Number of Terminals
Voltage (AC)(kV)
Voltage (DC)(kV)
Current (MAX)(A)
Electrode Material
Flange Standard
Flange Material
Flange Size (Nominal)
Operating Temperature Range (MIN ~ MAX)(℃)
Type of Related Component

    Insulation joint insulator

    Brand

    COSMOTEC

    Product Series

    Insulation joint insulator

    Days to Ship 4 Day(s) or more
    TypeRelated Components
    Number of Terminals-
    Voltage (AC)(kV)-
    Voltage (DC)(kV)-
    Current (MAX)(A)-
    Electrode Material-
    Flange Standard-
    Flange Material-
    Flange Size (Nominal)-
    Operating Temperature Range (MIN ~ MAX)(℃)-
    Type of Related ComponentInsulating Fittings

    Loading...

    1. 1

    Related Categories to Current Feedthrough, Lead-in Terminals