(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 21/4/2024 to 6:00 (SGT) 22/4/2024. We apologize for the inconvenience.
  • Please Note our New Address (effective April 1, 2024): 331 North Bridge Rd, #05-01 Odeon 331, Singapore 188720.

Screw-In Type Malleable Cast Iron Pipe Fitting 45° Elbow

Screw-In Type Malleable Cast Iron Pipe Fitting 45° Elbow

[Features]
• JFE pipe fittings are produced at cutting-edge facilities with thorough quality control.
• Moreover, ring stamp PL fittings are coat-baked with powder epoxy resin on the inner and outer surfaces, excluding screws, using a special coating method, providing enhanced adhesiveness, corrosion resistance, etc.
• Can be used with a high level of reliability.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
45L-B-1
45L-B-1/2
45L-B-1/4
45L-B-2
45L-B-3
45L-B-3/4
45L-B-3/8
45L-B-4
45L-B-5
45L-B-6
45L-B-11/2
45L-B-11/4
45L-B-21/2
45L-W-1
45L-W-1/2
45L-W-1/4
45L-W-2
45L-W-3
45L-W-3/4
45L-W-3/8
45L-W-4
45L-W-5
45L-W-6
45L-W-11/2
45L-W-11/4
45L-W-21/2
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Surface Treatment

SGD 7.41

1 Piece(s) 8 Day(s) or more 1B(25A)No

SGD 5.04

1 Piece(s) 8 Day(s) or more 1/2B(15A)No

SGD 5.73

1 Piece(s) 8 Day(s) or more 1/4B(8A)No

SGD 22.64

1 Piece(s) 8 Day(s) or more 2B(50A)No

SGD 48.93

1 Piece(s) 8 Day(s) or more 3B(80A)No

SGD 5.44

1 Piece(s) 8 Day(s) or more 3/4B(20A)No

SGD 5.73

1 Piece(s) 8 Day(s) or more 3/8B(10A)No

-

1 Piece(s) 12 Day(s) or more 4B(100A)No

-

1 Piece(s) 14 Day(s) or more 4B(100A)No

-

1 Piece(s) 14 Day(s) or more 6B(150A)No

SGD 15.23

1 Piece(s) 8 Day(s) or more 1 1/2B(40A)No

SGD 11.48

1 Piece(s) 8 Day(s) or more 1 1/4B(32A)No

SGD 48.93

1 Piece(s) 8 Day(s) or more 2 1/2B(65A)No

SGD 4.62

1 Piece(s) 8 Day(s) or more 1B(25A)Zinc Plating

SGD 3.38

1 Piece(s) 8 Day(s) or more 1/2B(15A)Zinc Plating

SGD 3.72

1 Piece(s) 8 Day(s) or more 1/4B(8A)Zinc Plating

SGD 13.58

1 Piece(s) 8 Day(s) or more 2B(50A)Zinc Plating

SGD 48.93

1 Piece(s) 8 Day(s) or more 3B(80A)Zinc Plating

SGD 3.59

1 Piece(s) 8 Day(s) or more 3/4B(20A)Zinc Plating

SGD 3.72

1 Piece(s) 8 Day(s) or more 3/8B(10A)Zinc Plating

-

1 Piece(s) 12 Day(s) or more 4B(100A)Zinc Plating

-

1 Piece(s) 14 Day(s) or more 4B(100A)Zinc Plating

-

1 Piece(s) 14 Day(s) or more 6B(150A)Zinc Plating

SGD 9.12

1 Piece(s) 8 Day(s) or more 1 1/2B(40A)Zinc Plating

SGD 6.87

1 Piece(s) 8 Day(s) or more 1 1/4B(32A)Zinc Plating

SGD 48.93

1 Piece(s) 8 Day(s) or more 2 1/2B(65A)Zinc Plating

Loading...

  1. 1

Basic Information

Connecting Shape 45° Elbow Connection Type Screw⇔Screw Same Diameter・Different Type Material Cast Iron
Connection Thread Type M1 Rc Applicable Fluid Water / Air / Steam / Gas / Oil Type Fitting
Max. Operating Pressure(MPa) 1 Divisions of Max. Operating Pressure 1.0Mpa or Less Interior Resin Lining No
Details of Max. Operating Pressure (Vapor/Air/Gas/Oil which is 300℃ or Less)(MPa) 1.0 Details of Max. Operating Pressure (Steady Flow which is 120℃ or Less)(MPa) 2.5

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)