(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 21/4/2024 to 6:00 (SGT) 22/4/2024. We apologize for the inconvenience.
  • Please Note our New Address (effective April 1, 2024): 331 North Bridge Rd, #05-01 Odeon 331, Singapore 188720.

Hanging Piping Bracket with No Assembled Hanging Turnbuckle (Zinc Plating/Stainless/Hot-Dip Galvanizing)

Hanging Piping Bracket with No Assembled Hanging Turnbuckle (Zinc Plating/Stainless/Hot-Dip Galvanizing)

Assembly type handing band for SGP and stainless steel pipes (thick pipes)

[Features]
· Assembled hanging band for use with SGP pipes.
· 250A or higher are made with ribless flat steel.
· Zinc electroplating finish

(i)Caution

  • Some of the items are scheduled to be discontinued as of end of March in 2023. The manufacturer keep the items produced but they are not available with Misumi.
    There are not the replacement items and the plan to resumption of sale. Please check the quotation and order screen for details.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
A10141-0017
A10141-0021
A10141-0036
A10141-0055
A10141-0060
A10141-0074
A10141-0089
A10141-0093
A10141-0106
A10141-0125
A10141-0130
A10141-0144
A10141-0159
A10141-0163
A10141-0178
A10141-0182
A10141-0197
A10200-0010
A10200-0024
A10200-0039
A10200-0043
A10200-0058
A10200-0062
A10200-0077
A10200-0081
A10200-0096
A10200-0109
A10200-0113
A10200-0128
A10200-0132
A10200-0147
A10200-0151
A11208-0027
A11208-0070
A11208-0084
A11208-0099
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Material Applicable Tube Type Surface Treatment Nominal Diameter (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)

SGD 0.97

1 Piece(s) 9 Day(s) or more 20~Less than 30SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating15A1/221.7

SGD 0.95

1 Piece(s) 9 Day(s) or more 20~Less than 30SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating20A3/427.2

SGD 1.01

1 Piece(s) 9 Day(s) or more 30~Less than 40SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating25A134

SGD 1.07

1 Piece(s) 9 Day(s) or more 40~Less than 50SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.7

SGD 1.34

1 Piece(s) 11 Day(s) or more 40~Less than 50SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.6

SGD 2.02

1 Piece(s) 11 Day(s) or more 60~Less than 70SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating50A260.5

SGD 2.90

1 Piece(s) 11 Day(s) or more 70~Less than 80SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating65A2 1/276.3

SGD 3.63

1 Piece(s) 11 Day(s) or more 80~Less than 90SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating80A389.1

SGD 6.83

1 Piece(s) 11 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating90A3 1/2101.6

SGD 4.80

1 Piece(s) 11 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating100A4114.3

SGD 8.17

1 Piece(s) 11 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating125A5139.8

SGD 11.54

1 Piece(s) 11 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating150A6165.2

SGD 18.88

1 Piece(s) 9 Day(s) or more 200~Less than 300SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating200A8216.3

SGD 42.33

1 Piece(s) 9 Day(s) or more 200~Less than 300SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating250A10267.4

SGD 51.11

1 Piece(s) 9 Day(s) or more 300~Less than 400SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating300A12318.5

SGD 55.42

1 Piece(s) 9 Day(s) or more 300~Less than 400SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating350A14355.6

SGD 73.90

1 Piece(s) 9 Day(s) or more 400~Less than 500SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating400A16406.4

SGD 4.05

1 Piece(s) 11 Day(s) or more 20~Less than 30[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No15A1/221.7

SGD 3.78

1 Piece(s) 11 Day(s) or more 20~Less than 30[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No20A3/427.2

SGD 4.06

1 Piece(s) 11 Day(s) or more 30~Less than 40[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No25A134

SGD 4.45

1 Piece(s) 6 Day(s) or more 40~Less than 50[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No32A1 1/442.7

SGD 4.67

1 Piece(s) 11 Day(s) or more 40~Less than 50[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No40A1 1/248.6

SGD 4.94

1 Piece(s) 11 Day(s) or more 60~Less than 70[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No50A260.5

SGD 8.62

1 Piece(s) 11 Day(s) or more 70~Less than 80[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No65A2 1/276.3

SGD 9.36

1 Piece(s) 11 Day(s) or more 80~Less than 90[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No80A389.1

SGD 11.25

1 Piece(s) 11 Day(s) or more 100~Less than 200[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No100A4114.3

SGD 22.69

1 Piece(s) 11 Day(s) or more 100~Less than 200[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No125A5139.8

SGD 31.11

1 Piece(s) 11 Day(s) or more 100~Less than 200[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No150A6165.2

SGD 50.75

1 Piece(s) 11 Day(s) or more 200~Less than 300[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No200A8216.3

SGD 88.49

1 Piece(s) 11 Day(s) or more 200~Less than 300[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No250A10267.4

SGD 105.91

1 Piece(s) 11 Day(s) or more 300~Less than 400[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No300A12318.5

SGD 11.25

1 Piece(s) 11 Day(s) or more 100~Less than 200[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No90A3 1/2101.6

SGD 4.13

1 Piece(s) 16 Day(s) or more 20~Less than 30SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)20A3/427.2

SGD 6.03

1 Piece(s) 16 Day(s) or more 60~Less than 70SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)50A260.5

SGD 9.50

1 Piece(s) 12 Day(s) or more 70~Less than 80SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)65A2 1/276.3

SGD 10.71

1 Piece(s) 12 Day(s) or more 80~Less than 90SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)80A389.1

Loading...

  1. 1

Basic Information

Type Hanging Band Qty.(piece) 1

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)