(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

U-Shaped Metal Fitting U Band (Electro-Galvanized/Stainless Steel/Dip Plating/Black U Band)

U-Shaped Metal Fitting U Band (Electro-Galvanized/Stainless Steel/Dip Plating/Black U Band)

U Band for SGP Pipe and Stainless Steel (Thick) Pipe

(i)Caution

  • Some of the items are scheduled to be discontinued as of end of March in 2023. The manufacturer keep the items produced but they are not available with Misumi.
    There are not the replacement items and the plan to resumption of sale. Please check the quotation and order screen for details.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

Part Number
A10598-0011
A10598-0026
A10598-0045
A10598-0050
A10598-0064
A10598-0079
A10598-0083
A10598-0098
A10598-0115
A10598-0120
A10598-0134
A10618-0016
A10618-0035
A10618-0040
A10618-0054
A10618-0069
A10618-0073
A10618-0088
A10618-0092
A10618-0105
A10618-0110
A10618-0124
A10633-0012
A10633-0027
A10633-0031
A10633-0046
A10633-0065
A10633-0070
A10633-0084
A10633-0099
A10633-0101
A10633-0135
A10634-0081
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Material Applicable Pipe Type Surface Treatment The size of diameter of steel pipe (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)

SGD 4.36

1 Piece(s) 7 Day(s) or more 20~Less than 30Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating15A1/221.7

SGD 4.06

1 Piece(s) 6 Day(s) or more 20~Less than 30Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating20A3/427.2

SGD 4.21

1 Piece(s) 6 Day(s) or more 30~Less than 40Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating25A134

SGD 4.60

1 Piece(s) 4 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.7

SGD 5.59

1 Piece(s) 4 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.6

SGD 5.94

1 Piece(s) 6 Day(s) or more 60~Less than 70Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating50A260.5

SGD 6.49

1 Piece(s) 6 Day(s) or more 70~Less than 80Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating65A2 1/276.3

SGD 6.74

1 Piece(s) 4 Day(s) or more 80~Less than 90Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating80A389.1

SGD 7.18

1 Piece(s) 4 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating100A4114.3

SGD 14.62

1 Piece(s) 4 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating125A5139.8

SGD 15.95

1 Piece(s) 4 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating150A6165.2

SGD 15.95

1 Piece(s) 4 Day(s) or more 20~Less than 30[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No15A1/221.7

SGD 13.01

1 Piece(s) 6 Day(s) or more 20~Less than 30[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No20A3/427.2

SGD 13.16

1 Piece(s) 4 Day(s) or more 30~Less than 40[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No25A134

SGD 15.77

1 Piece(s) 6 Day(s) or more 40~Less than 50[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No32A1 1/442.7

SGD 14.72

1 Piece(s) 4 Day(s) or more 40~Less than 50[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No40A1 1/248.6

SGD 16.25

1 Piece(s) 4 Day(s) or more 60~Less than 70[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No50A260.5

SGD 18.88

1 Piece(s) 4 Day(s) or more 70~Less than 80[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No65A2 1/276.3

SGD 20.35

1 Piece(s) 4 Day(s) or more 80~Less than 90[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No80A389.1

SGD 20.35

1 Piece(s) 4 Day(s) or more 100~Less than 200[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No100A4114.3

SGD 42.33

1 Piece(s) 11 Day(s) or more 100~Less than 200[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No125A5139.8

SGD 43.79

1 Piece(s) 6 Day(s) or more 100~Less than 200[Stainless Steel] SUS304[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No150A6165.2

SGD 11.55

1 Piece(s) 7 Day(s) or more 20~Less than 30Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Hot zinc plating15A1/221.7

SGD 11.55

1 Piece(s) 7 Day(s) or more 20~Less than 30Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Hot zinc plating20A3/427.2

SGD 12.54

1 Piece(s) 7 Day(s) or more 30~Less than 40Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Hot zinc plating25A134

SGD 14.14

1 Piece(s) 6 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Hot zinc plating32A1 1/442.7

SGD 16.20

1 Piece(s) 7 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Hot zinc plating40A1 1/248.6

SGD 17.91

1 Piece(s) 6 Day(s) or more 60~Less than 70Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Hot zinc plating50A260.5

SGD 20.13

1 Piece(s) 7 Day(s) or more 70~Less than 80Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Hot zinc plating65A2 1/276.3

SGD 23.59

1 Piece(s) 6 Day(s) or more 80~Less than 90Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Hot zinc plating80A389.1

SGD 25.24

1 Piece(s) 6 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Hot zinc plating100A4114.3

SGD 47.19

1 Piece(s) 5 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Hot zinc plating150A6165.2

SGD 48.26

1 Piece(s) 17 Day(s) or more 80~Less than 90Steel[Steel Pipe / Coated Steel Pipe] SGP PipePolyester Powder Coating80A389.1

Loading...

  1. 1

Basic Information

Type U Band Qty.(piece) 1

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)